02.
Preparation Phase
There’s a small amount of preparation required from you and your team, before we can lay the floor. These will be identified to you on the site visit, along with a checklist for your employees. This might include actions like, tidy away loose paperwork, ensure your computer is turned off, empty items that need to be manually moved